1 BE-BI activities in EYETS 2016/17 23. 08. 2016 G. Schneider BE-BI
2 Details BPM (Ch. Boccard) Activity 10906: Wire collimators: Replace TCTPH. 4 R 5. B 2 & TCL. 4 L 5. B 2(H) in IR 5 with TCTPW for BBLR compensation: slots TCTPH. 4 R 5. B 2 (that has already BPMs) and TCL. 4 L 5. B 2 (that at present does not have BPMs) DIC sent 1 more DOROS box Activity 10538: Installation in February 2017 of one TCSPM prototype in P 7: slot TCSM. D 4 R 7. B 2 empty slot -> TCSM. D 4 R 7. B 2 DIC done to add a pair off CMC 50 1 DOROS box Activity 10913: Replacement of TCP with TCPP in P 7: slot TCP. C 6 L 7. B 1 -> TCPP. C 6 L 7. B 1 DIC done 1 DOROS box BPMSA for AFP in 6 L 1 ECR in approval DIC done 1 DOROS box Not yet decided: Replace BPMD in TD 68 23. 08. 2016 G. Schneider BE-BI
3 Details BLM cables (S. Grishin) 1) BLMQI. 05 R 8. B 2 E 30 for MKI modification at P 8: dismount, may be relocation 2) 2 new BLMs for Xtal installation 3) Modification of BLM support for TCDI (? ) 4) The installation of 2 new AFP@6 L 1 monitors 5) The monitor connection coincidence in injection area 6) The slot labels 7) Check the new monitors with new irradiator 8) XRP@04 L 5 was removed and we see the possibility of the removal of the corresponding ( “useless”) monitors. 9) Removal of mobile monitors for ALFA@R 1 (? ) 23. 08. 2016 G. Schneider BE-BI
4 Details DOROS (M. Gasior) DOROS activities will concern: - Adding new DOROS electronics for the new collimators with BPMs in P 7 (TCSPM and TCPP); - Adding new DOROS electronics for the BBLR collimator in P 5 (TCTW); - Potentially upgrading DOROS installations in P 1, P 2, P 5, P 6 and P 8. The work will be just installation of electronic modules and connecting them to the beam signals, Ethernet and timing fibres. For the new installations the estimate is two days per point and for the upgrades also two days per point. Most of the concerned locations are UAs. 23. 08. 2016 G. Schneider BE-BI
- Slides: 4